CE2402 Estimation and Quantity Surveying B.E Question Bank : valliammai.co.in

Name of the College : Valliammai Engineering College
Subject : Estimation and Quantity Surveying
Website : valliammai.co.in
Document Type : Question Bank
Department : Civil Engineering
Semester : 7
Degree : B.E

Question Bank : https://www.pdfquestion.in/uploads/valliammai.co.in/1710-Estimation%20and%20Quantity%20Surveying.pdf

Valliammai Engineering Quantity Surveying Question Paper

DEPARTMENT OF CIVIL ENGINEERING
VII SEMESTER
CE 2402 – ESTIMATION AND QUANTITY SURVEYING

Related / Similar Question Bank :
Valliammai B.E (Civil) Prestressed Concrete Structures Question Bank

Two Marks

1. What are methods to be adopted for volume calculating?
2. Define analysis of rates.
3. Define a tender.
4. Define contract.


5. What are the types of culvert?
6. What are the methods of estimate?
7. What are the types of estimate?
8. Briefly explain about preliminary Estimate.
9. Estimate the quantities of brickwork and plastering required in a wall 4m long, 3m high and 30 cm thick. Calculate also the cost if the rate of brickwork is Rs.32.00 per cu.m and of plastering is Rs. 8.50 per sq.m
10. Define detailed estimate
11. Define Abstract estimate
12. Define quantity surveyor
13. Write the duties of quantity surveyor.
14. Write the essential qualities of a good surveyor.
15. What are the main components of culvert?
16. What are factors to be considered in design of septic tank?
17. Define lead.
18. Define lift.
19. The actual expenditure incurred in the construction of a school building which have a total length of main walls 140m is Rs.4.97lakhs.Estimate the approximate cost of a similar school building which will have 180m length of main walls.
20. Write the formula for Mid ordinate rule and Prismoidal formula Rule.
21. Define estimate.
22. Write the recommendation for degree of accuracy in measurements.
23. Briefly explain about revised estimate
24. Calculate the quality of brickwork in an arch over a 1.80m span opening. The arch is 40cm. thick and the breath of a wall is 40 cm.
25. Define Floor area
26. Define Carpet area
27. Define Plinth area
28. What are the methods of taking out estimates?
29. Briefly explain about Out to Out and in to in method.
30. Briefly explain about bay method.
31. Workout the quality of stone metal required for 2Km.Length for wearing coat of a 4m wide road. The thickness of the metal road required is 12cm loose.
32. An approach road 2Km.long is to be constructed. Work out the quantity of materials required i.e. stone metal and bricks. Data is given below.
33. A cement concrete road (1:2:3) is to be constructed over the existing water bound macadam road .The thickness of slab =10cm.The length of the road is one km and the width 3.60m.Calculate the quality of cement concrete and the material required.
34. Calculate the quality of earthwork for the construction of an approach road
35. What are the methods of measurements of earthwork?
36. write the essentials requirements of contract.
37. what are the types of contract?
38. what are the important legal implications of a contract?
39. What is specification?
40. State the different types of specification.
41. Describe general or brief specification
42. Describe detailed specification
43. What are the types of penalties that are imposed on a contract and why are they imposed?
44. What is arbitration?
45. Why and when the earnest money deposit are collected?
46. Why and when the security deposit are collected?
47. What is a tender notice?
48. What informations should a contract document contain?
49. Define valuation
50. What are the important factors influencing the value of building?

51. What is the purpose of valuations?
52. Define Floor rate.
53. Define Plinth area rate.
54. A property fetches a net income of Rs.900.00 deducting all outgoings. Workout the capitalized value of the property if the rate of interest is 6% per annum.
55. Find the plinth area required for the residential accommodation for an assistant Engineer in the pay scale of Rs.400.00 to 1,000 per month.
56. A pumping set with a motor has been installed in a building at a cost Rs.2500.00.Assuming the life of the pump as 15 years, workout the amount of annual installment of sinking fund to be deposited to accumulate the whole amount of 4% compound interest.
57. An old building has been purchased by a person at a cost of Rs.30,000/- excluding the cost of the land. Calculate the amount of annual sinking fund at 4% interest assuming the future life of the building as 20 years and scarp value of the building as 10% of the cost of purchase.
58. Write the necessity of valuation.
59. Define the Value
60. Define the Cost:
61. Define the Gross income:
62. Define the Net come:
63. Define the Obsolescence:
64. Define the Scrap Value:
65. Define the Salvage value
66. Define the Capitalized value
67. Define sinking fund.
68. Define Market value
69. Define Book value
70. Write the various methods of valuation.

Design Of Machine Elements

Unit- I (Steady Stresses And Variable Stresses In Machine Members)
Part – A ( 2 Marks)
1. Define: Factor of safety
2. Define endurance limit.
3. What is impact load?
4. What are the various phases of design process?
5. What are the different types of loads that can act on machine components?
6. What are the factors affecting endurance strength. at are the types of variable stresses?
7.Differentiate between repeated stress and reversed stress.
8. What are the types of fracture?
9. Distinguish between brittle fracture and ductile fracture.
10. Define stress concentration and stress concentration factor.
11. Explain size factor in endurance strength. Size factor is used to consider the effect of the size
12. Explain Griffith theory. (Or) State the condition for crack growth.
13. What are the modes of fracture?
14. What are the factors to be considered in the selection of materials for a machine element?
15. What are various theories of failure?
16. List out the factors involved in arriving at factor of safety
17. Give some methods of reducing stress concentration.
18. Explain notch sensitivity.
19. What are the factors that affect notch sensitivity?
20.What is an S-N Curve?

1 Comment
Add a Comment
  1. CE2026 Traffic Engineering and Management

Leave a Reply

How to add comment : 1) Type your comment below. 2) Type your name. 3) Post comment.

www.pdfquestion.in © 2021

Contact Us   Privacy Policy   SiteMap